Skip to content
Cid Oliva

Partial renovation

Roof and terrace waterproofing in Gran Canaria

Most of the leaks we get called to have already been repaired once or twice. The reason is nearly always the same: someone sealed where the stain was, not where the water was getting in.

Water travels along the cavity or the fall before it shows. Finding the real entry point is half the job.

01Scope

What it includes

  • 01

    Locating the entry point

    Before quoting anything.

  • 02

    Removing failed layers

    Waterproofing laid over waterproofing always fails eventually.

  • 03

    Forming falls

    If water stands, any system will give up sooner or later.

  • 04

    Waterproofing system

    Liquid membrane, bituminous sheet or rubber depending on use and foot traffic.

  • 05

    Upstands and outlets

    Junctions with parapets and drains — where it usually gets in.

Typical timeline: 1 to 3 weeks.

02Price

What it costs

  • Liquid membrane

    €35 – €55 per m²

  • Bituminous sheet with protection

    €50 – €80 per m²

  • Including new falls

    €75 – €120 per m²

Indicative ranges, excluding IGIC (Canary Islands sales tax). The real figure depends on the starting condition, the specification and access. Only a site visit gives a reliable number.

03Questions

Frequently asked

Can you find where the water is getting in?
Yes, and it is the first thing we do. Quoting a waterproofing job without knowing the entry point is guessing.
How long does waterproofing last?
10 to 20 years depending on the system and whether the roof is walked on. The specific guarantee is written into the quote.

Tell us about your project

Four details and we call you back. Site visit and quote anywhere on the island, free and with no obligation.

CallWhatsApp
659 477 931