Skip to content
Cid Oliva

Partial renovation

Bathroom renovation in Gran Canaria

The bathroom is the most requested job and the one that ages worst when it is rushed. A fall laid wrong or a joint sealed badly does not show on day one — it shows a year later, as damp on the ceiling of the flat below.

We redo the waterproofing every time, even when the other quote says it is fine as it is.

01Scope

What it includes

  • 01

    Strip-out and removal

    Including the old bath.

  • 02

    New plumbing and waste

    The installation is replaced, not patched.

  • 03

    Waterproofing of the wet area

    Membrane or waterproof render before tiling. Always.

  • 04

    Set-out tiling

    We work out where the cuts fall so they are not in your eyeline.

  • 05

    Sanitaryware and screen

    Fitted and sealed.

Typical timeline: 10 to 15 working days.

02Price

What it costs

  • Complete bathroom, 4-6 m²

    €4,500 – €7,500

  • Large bathroom or layout change

    €7,500 – €12,000

  • Bath to shower conversion

    Without redoing the rest of the bathroom.

    €1,400 – €2,600

Indicative ranges, excluding IGIC (Canary Islands sales tax). The real figure depends on the starting condition, the specification and access. Only a site visit gives a reliable number.

03Questions

Frequently asked

Can I swap the bath for a shower without redoing the whole bathroom?
Yes, and it is the most common request. The usual snag is matching the existing tile: if we cannot source it, it is worth considering doing the bathroom completely.
Do I need a licence?
Usually a simple prior notification is enough, unless you move the layout or touch communal soil pipes. We check it for your municipality.

Tell us about your project

Four details and we call you back. Site visit and quote anywhere on the island, free and with no obligation.

CallWhatsApp
659 477 931